PROJECT OVERVIEW

MLC CAMP JETTY
BANKSIA PENINSULA, VIC

PRINCIPAL

LOCATION

VALUE

With an old timber jetty at the end of its life Methodist Ladies College (MLC) Banksia Camp needed a new jetty with a number of purposes. It was to stand in good stead for the next number of generations visiting the camp, serve in all weather (including serious storm) for their boats and be able to handle the use and loading of large groups of students visiting the camp safely. Partnering with Anchor Products we were able to construct a Fibre Reinforced Polymer (FRP) jetty to outlast us all. 

Methodist Ladies College

Duck Arm, Banksia Peninsula